MEDITERA

2021 Tire - IZMIR - TURKIYE
  • New building with 16,000 m2 closed area
  •  Entire fire extinguishing system

                            - Special sprinkler system

                            - Fire pump room installation

                            - Entire outdoor hydrant system

                            - Entire factory area and administrative building fire cabinet

  •  Administrative building ventilation system

                            - WC ventilation

                            - Dressing rooms

  •  Office air conditioning system

                            - Domestic water system

                            - Rain recovery system

                            - VRV air conditioning system